|
|
|
Key Features of Our Technology :
|
||
Benefits :
|
||
Crushing & Proportioning :In cement manufacturing process the main raw
material is limestone grinding, which is crushed and transported to the
pre-blending stockpile by means of a belt conveyor. After reclaiming it
is stored into the respective hoppers along with other Raw materials.
These raw materials then are extracted in desired proportion with the
help of electronic weigh feeder & transported to the raw mill for
fine grinding. |
||
Raw Milling & Blending :The raw mill is a closed circuit ball mill equipped
with high efficiency separator. After grinding to 90 microns size the
raw meal is send to the continuous blending silos (CFC) for
homogenization & extracted by means of load cell hopper for feeding
to the kiln pre heaters. |
||
Pyro Processing :It consists of series of low-pressure drop, cyclones
arranged in various stages, where the calcinations begin and material
goes into the Rotary Kiln and after clinkerization the hot material is
sent to the cooler for its cooling. The cooler is efficiently designed
to recover maximize heat while cooling the hot clinker which is then
crushed & sent to the stock pile for intermediate storage. The
required temperature for the clinkerisation is about 1500oC, which can
be attained either by Coal, Gas or Oil. |
||
Cement Milling, Storage & Packing :The clinker mixed with app. 5% of gypsum is sent to
the cement mill (Ball Mill) for fine grinding to produce cement. It is
then transported to CFC silo for blending & storage and is packed in
the bags with helps of auto packers & transported to the market for
sale |
||